Coal
"http://www.nddfmf.com.CN/" target=_blank> heat transfer oil furnace practice: before, start checking 1, Heating furnace and its surrounding is clean and free of debris, check the furnace, burner, controller, glory hole, smoke (chimney) and other details are often; 2, and pour pass technology equipment and the process, check thermal conductivity oil furnace expansion slot oil bit whether in 1/4-1/2 liquid bit above location, thermometer, and pressure table, whether normal; 3, and connected heating furnace control cabinet power, check voltage whether normal, check led and the the displayed instrument whether normal; 4, and adjustment good gas main pressure reducing valve, and times decompression valve, make pressure control for 0.005 MPa.
II, and started 1, and started thermal conductivity oil cycle pump (games a preparation a, reference pump practice for implementation), Kai pump Hou normal cycle 0.5 hours around make pressure smooth; 2, and by combustion Manager started button, observation furnace flame whether normal combustion, if not ignition, should in excluded fault Hou, again started combustion Manager
three, and stopped furnace operation 1, and normal stopped furnace ① gradually reduced temperature , Turn off the burner, to stop burning; ② hot oil temperature below 70 ° c per cent, stop hot oil circulation pump operation (refer to pump operating rules implementation); ③ turn off main power, succession records. 2. emergency shutdown due to emergencies when the emergency shutdown, should quickly turn off the burner, burner both burners hinge axis moves, a natural ventilation between the furnace and chimney status, will be distributed in the furnace heat, heat transfer oil to natural cooling, prevent the heat conduction oil stove from overheating.: a, and started Qian of check 1, and heating furnace and around whether clean no debris, check furnace body, and combustion Manager, and controller, and see fire hole, and smoke (chimney) road, whether normal; 2, and pour pass technology equipment and the process, check expansion slot oil bit whether in 1/4-1/2 liquid bit above location, thermometer, and pressure table, whether normal; 3, and connected heating furnace control cabinet power, check voltage whether normal, thermal conductivity oil furnace check led and the the displayed instrument whether normal; 4, and adjustment good gas main pressure reducing valve , Pressure reducing valve, pressure control is 0.005 MPa.
heat conduction oil stove http://www.nddfmf.com.cn
。